Project Execution

From Factory Acceptance Test to Site Acceptance Test

Each customer project is handled by a dedicated Project Manager, who is the first level of contact to the customer team. Quality and times lines, as well as project status reporting, are the main focus in addition to risk management, resource management and cost control. Guided by our dedicated team of lead engineers, experienced manufacturing teams complete the assembly, manufacturing and commissioning tests during FAT/SAT, ensuring the high level of quality required by pharmaceutical industries. During the execution phase all relevant manufacturing and commissioning test documents are prepared and approved by the customer before handover together with a compressive documentation package.

Typical tasks and deliverables during Project Execution:

? Project Management

? Assembly and Manufacturing

? Commissioning and Qualification

? Factory Acceptance Test (FAT)

? On-Site Installation

? Site Acceptance Test (SAT)

探索我們的項目階段:

我們的集成解決方案團隊致力于開發和實施快速且經濟高效的生物制造解決方案,涵蓋早期開發、規模放大,再到商業制造的各個階段。

第1步:工藝優化

了解更多

第2步:工藝建模

了解更多

第3步:概念設計

了解更多

第4步:基礎工程設計

了解更多

第5步:詳細工程設計

了解更多

第6步:項目執行

了解更多

聯系我們

我們如何為您提供幫助?*

聯系我們

擴展您的知識

獨家案例研究

立即閱讀

顛覆行業規則的網絡研討會和視頻

立即觀看

探索我們的電子書和出版物

在這里下載
美女扒开内裤无遮挡禁18